AIRPORT PROJECT BY DIAMOND
POINT LTD. IN MACHESTER, ENGLAND
-
A transformed Terminal 2 expanded by 140 percent with a direct link to a revamped Terminal 3 (taking potential passenger capacity from around 25m to 50m).
-
New Air Side Transfer Facilities so passengers can walk directly from aircraft to terminal.
-
Links so connecting passengers don’t have to leave the buildings.
-
Improved and automated bag check-in and faster security.
-
A new US pre-clearance facility so passengers can get through immigration, customs, and agricultural inspection before boarding their flight.
-
Around 50 food and drink outlets.
-
More stands and piers for aircraft.
-
Improved infrastructure around the airport with good links to the £800m Airport City.
Proposed Air Side Development of New T2 Extension providing docking and taxiing facilities for all new aircraft including the New A380.
Proposed New Food Hall within the Terminal.
DIAMOND POINT LTD. worked with both Jacobs Consultants and HLPP to provide airside services to docked aircraft such as auto docking stations, FEGP air side 400Hz power units, apron general lighting, and follow me lighting systems throughout the new runway and apron sections.
They were also responsible for the design and co-ordination of two new substations along the runway and all internal electrical distribution, containment and power outlets and diversion works throughout the site.
Proposed New Food Hall Work progressing on the new terminal building and new multi-story car park. within the Terminal.
Proposed New Departures Hall
Proposed New Proposed New Airport Drop Off and Approach Road Departures Hall
Proposed New Baggage Reclaim Areas